	<title>SAUDI ARABIA &#8211; STFA Construction Group</title>
	<atom:link href="https://construction.stfa.com/portfolio_tag/saudi-arabia/feed/" rel="self" type="application/rss+xml" />
	<link>https://construction.stfa.com</link>
	<description>We Know How</description>
	<lastBuildDate>Sat, 12 Nov 2016 14:39:14 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
	<item>
		<title>Upgrade Ju&#8217;aymah Pier</title>
		<link>https://construction.stfa.com/project/upgrade-juaymah-pier/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Fri, 26 Sep 2014 13:04:25 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=1390</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Toilet Blocks in Muna Phase I</title>
		<link>https://construction.stfa.com/project/toilet-blocks-in-muna-phase-i/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 16:53:21 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=589</guid>

					<description><![CDATA[The contract covers the construction of 140 prefabricated (mountable-dismountable) toilet blocks serving 5020 pilgrams at the same time during the Hadj ...]]></description>
										<content:encoded><![CDATA[<p>The contract covers the construction of  140 prefabricated (mountable-dismountable) toilet blocks serving 5020 pilgrams at the same time during the Hadj period.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Water Distribution Network, Phase Ii, Makkah</title>
		<link>https://construction.stfa.com/project/water-distribution-network-phase-ii-makkah/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 15:00:53 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=570</guid>

					<description><![CDATA[The project covers the providing all material, labour, equipment and installation of a water distribution network, setting up valves, valve chambers, ...]]></description>
										<content:encoded><![CDATA[<p>The project covers the providing all material, labour, equipment and installation of a water distribution network, setting up valves, valve chambers, water hydrants, fire hydrants and water sewerage connection.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Muna Project Bulk Reservoir No.1, Roof Structure</title>
		<link>https://construction.stfa.com/project/muna-project-bulk-reservoir-no-1-roof-structure/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 15:00:04 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=569</guid>

					<description><![CDATA[The project covered the construction of a cable stayed reinforced concrete to shell roof, 330 m in diameter cover for approximately ...]]></description>
										<content:encoded><![CDATA[<p>The project covered the construction of a cable stayed reinforced concrete to shell roof, 330 m in diameter cover for approximately one million water cubic meter circular bulk storage reservoir near Al-Maarsine-Makkah.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Storm Water Drainage Project Of Holy, Makkah</title>
		<link>https://construction.stfa.com/project/storm-water-drainage-project-of-holy-makkah/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 14:57:40 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=568</guid>

					<description><![CDATA[The project covered the drainage lines leading to the new Shoheda Dam, construction of 7000 m. of various types of box ...]]></description>
										<content:encoded><![CDATA[<p>The project covered the drainage lines leading to the new Shoheda Dam, construction of 7000 m. of various types of box culverts and restauration works of Al Hadj Street in accordance with the contract scope and variation orders.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Construction Of Water Transmission Main and Pumping Station in the Holy City Of Makkah, Contract-1</title>
		<link>https://construction.stfa.com/project/construction-of-water-transmission-main-and-pumping-station-in-the-holy-city-of-makkah-contract-1/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 14:56:56 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=567</guid>

					<description><![CDATA[The project involved the construction of a 6000 m3/hr capacity pumping station, a twin water transmission main 9920 m long with ...]]></description>
										<content:encoded><![CDATA[<p>The project involved the construction of a 6000 m3/hr capacity pumping station, a twin water transmission main 9920 m long with 1000 mm diameter and also another 16951 m. long 1000 mm. Diameter single water transmission main.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Northern Jeddah Drainage Channel Culvert Project</title>
		<link>https://construction.stfa.com/project/northern-jeddah-drainage-channel-culvert-project/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 14:44:21 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=557</guid>

					<description><![CDATA[The Project consisting from 3 packages has a total value of 85.275.959 USD. The first package covers 2194 m. Length (3,25 ...]]></description>
										<content:encoded><![CDATA[<p>The Project consisting from 3 packages has a total value of 85.275.959 USD. The first package covers 2194 m. Length (3,25 m x 2,95 m)  box culverts with 6 cells. The Section 2 covers 5800 m. length (3,25 m. X 2,90 m. &#8211; 3,25 m. X 4 m. ) box culverts with 3 cells. The Section 3 covers 6800 m. length (3,25 m. X 2,95 m. ) box culverts with 3 cells.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Muna Project Tunnels 3a &#8211; 3b</title>
		<link>https://construction.stfa.com/project/muna-project-tunnels-3a-3b/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 14:26:40 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=553</guid>

					<description><![CDATA[The construction of two pedestrian tunnels as part of the transportation system of facilitate the pilgrimage traffic between Kaabe and Holy ...]]></description>
										<content:encoded><![CDATA[<p>The construction of two pedestrian tunnels as part of the transportation system of facilitate the pilgrimage traffic between Kaabe and Holy places during Hadj season in Makkah. The tunnels are in horse shoe section with dia 12.5m and length is 1225 m.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Muna Project Toilet Tunnels 3a, 3b, 3c in Makkah Area</title>
		<link>https://construction.stfa.com/project/muna-project-toilet-tunnels-3a-3b-3c-in-makkah-area/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 14:25:48 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=552</guid>

					<description><![CDATA[The Project covered the construction of the first three Toilet Tunnels of the Muna Project, situated at both sides of the ...]]></description>
										<content:encoded><![CDATA[<p>The Project covered the construction of the first three Toilet Tunnels of the Muna Project, situated at both sides of the Muna Project Tunnels 3A-3B facing Kaabe to provide toilet facilities to 600 pilgrims simultaneously, especially during the Hadj Season.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Muna Project Tunnels 2a-2b</title>
		<link>https://construction.stfa.com/project/muna-project-tunnels-2a-2b/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 14:25:01 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=551</guid>

					<description><![CDATA[The Project covered the construction of two parallel semicircular pedestrian tunnels as part of the transportation system to facilitate the pilgrimage ...]]></description>
										<content:encoded><![CDATA[<p>The Project covered the construction of two parallel semicircular pedestrian tunnels as part of the transportation system to facilitate the pilgrimage traffic between Kaabe and Holy Places during Hadj Season in Mecca.<br />
The tunnels are in horse shoe section.</p>
]]></content:encoded>
					
		
		