<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>QATAR &#8211; STFA Construction Group</title>
	<atom:link href="https://construction.stfa.com/portfolio_tag/qatar/feed/" rel="self" type="application/rss+xml" />
	<link>https://construction.stfa.com</link>
	<description>We Know How</description>
	<lastBuildDate>Mon, 13 Mar 2023 07:48:12 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
	<item>
		<title>Doha Metro Gold Line Curtain Grouting Works</title>
		<link>https://construction.stfa.com/project/doha-metro-gold-line-curtain-grouting-works/</link>
		
		<dc:creator><![CDATA[Ferdi Tiyek]]></dc:creator>
		<pubDate>Sun, 10 Jul 2016 14:09:15 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=4164</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[
<div id="wpc_69f61675d6845" class="vc_row wpb_row vc_row-fluid  ">
		<div class="row_inner_wrapper  clearfix">
			<div class="row_inner row_center_content clearfix"><div class="wpb_column vc_column_container vc_col-sm-12"><div class="vc_column-inner"><div class="wpb_wrapper">
	<div class="wpb_text_column wpb_content_element " >
		<div class="wpb_wrapper">
			<p>In the scope of Doha Metro Gold Line Project, curtain grouting is planned for reduction of the groundwater inflow during the construction phase . In order to achieve that various numbers of both vertical and inclined (up to 18° from vertical) boreholes are drilled down to 36m depth and grouted bottom up by single packer grouting method at 5m long stages having 10 to 2 bars of descending pressure criteria.</p>

		</div>
	</div>
</div></div></div>
			</div>
		</div>
</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Qatar Integrated Railway Project  Design &#038; Build Package 3  Gold Line Underground</title>
		<link>https://construction.stfa.com/project/qatar-integrated-railway-project-design-build-package-3-gold-line-underground/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Fri, 26 Sep 2014 11:58:25 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=1378</guid>

					<description><![CDATA[Tunnel Construction, Station Construction, Switchboxes, Emergency Exits, Passengerway (NATM / CutCover), Architectural Finishes (PS), ElectroMechanical Works (PS), Utilities (PS) Click to ...]]></description>
										<content:encoded><![CDATA[<p>Tunnel Construction, Station Construction, Switchboxes, Emergency Exits, Passengerway (NATM / CutCover), Architectural Finishes (PS), ElectroMechanical Works (PS), Utilities (PS)</p>
<p><strong>Click to watch video.</strong></p>
<blockquote class="wp-embedded-content" data-secret="NxbRp6iEWS"><p><a href="https://construction.stfa.com/qatar-integrated-railway-project-design-build-package-3-gold-line-underground/">Qatar Integrated Railway Project  Design &#038; Build Package 3  Gold Line Underground</a></p></blockquote>
<p><iframe class="wp-embedded-content" sandbox="allow-scripts" security="restricted"  title="&#8220;Qatar Integrated Railway Project  Design &#038; Build Package 3  Gold Line Underground&#8221; &#8212; STFA Construction Group" src="https://construction.stfa.com/qatar-integrated-railway-project-design-build-package-3-gold-line-underground/embed/#?secret=b1WvbNsm0D#?secret=NxbRp6iEWS" data-secret="NxbRp6iEWS" width="600" height="338" frameborder="0" marginwidth="0" marginheight="0" scrolling="no"></iframe></p>
<p>&nbsp;</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Common Lean Lng Loading Facilities Berth 6</title>
		<link>https://construction.stfa.com/project/common-lean-lng-loading-facilities-berth-6/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Fri, 30 May 2014 20:09:12 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=462</guid>

					<description><![CDATA[The project consists of the marine construction works on the common Lean LNG Loading Facilities at Berth 6.]]></description>
										<content:encoded><![CDATA[<p>The project consists of the marine construction works on the common Lean LNG Loading Facilities at Berth 6.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Epic for Gabbro Berth Expansion (package 1) at Mesaieed Port</title>
		<link>https://construction.stfa.com/project/epic-for-gabbro-berth-expansion-package-1-at-mesaieed-port/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Fri, 30 May 2014 20:08:17 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=461</guid>

					<description><![CDATA[The project consists of Construction of breakwaters to create the New Port and Drydock Complex The scope of the project shall ...]]></description>
										<content:encoded><![CDATA[<p>The project consists of Construction of breakwaters to create the New Port and Drydock Complex The scope of the project shall consist of, widening of existing channel to Gabbro Berths, deepening of existing basin at Gabbro Berths 1 and 2, dredging of new basin for new Gabbro Berth 3, construction of the 400 m long new quay wall for Gabbro Berth 3, filling and reclamation behind the quay wall, procurement, design and manufacture of Ship to Shore Cranes, construction of substation and carrying out related electrical works.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Engineering, Procurement, Installation and Commissioning Of New Service Berth  at Ras Laffan</title>
		<link>https://construction.stfa.com/project/engineering-procurement-installation-and-commissioning-of-new-service-berth-at-ras-laffan/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Fri, 30 May 2014 20:03:03 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=456</guid>

					<description><![CDATA[Engineering, Procurement, Installation and Commissioning of New Service Berth at Ras Laffan. The scope covers the construction of Service Berth complete ...]]></description>
										<content:encoded><![CDATA[<p>Engineering, Procurement, Installation and Commissioning of New Service Berth at Ras Laffan.<br />
The scope covers the construction of Service Berth complete with 530 m long precast concrete blockwork quay wall, fill roads, drainage, duct bank crossings.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Ras Gas Onshore Expansion Project, Design and Construction Of Lng Berth No. 3 and Flares</title>
		<link>https://construction.stfa.com/project/ras-gas-onshore-expansion-project-design-and-construction-of-lng-berth-no-3-and-flares/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Fri, 30 May 2014 19:55:27 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=450</guid>

					<description><![CDATA[The project comprised of the construction of a concrete block loading platform and two breasting, eight mooring dolphine structure. Other than ...]]></description>
										<content:encoded><![CDATA[<p>The project comprised of the construction of a concrete block loading platform and two breasting, eight mooring dolphine structure. Other than 3 flares, the structure was constructured offshore.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Design and Construction Of Lng Berth No.4 and Flares</title>
		<link>https://construction.stfa.com/project/design-and-construction-of-lng-berth-no-4-and-flares/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Fri, 30 May 2014 17:47:42 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=442</guid>

					<description><![CDATA[The Project covers the construction of a LNG Loading Berth with 4 Nos Breasting Dolphins and 8 Nos Mooring Dolphins for ...]]></description>
										<content:encoded><![CDATA[<p>The Project covers the construction of a LNG Loading Berth with 4 Nos Breasting Dolphins and 8 Nos Mooring Dolphins for 250.000 m3 LNG Carries. Lmcb Reclamation, Brekwater Extension, Berth 5 Reclamation Works.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Repair Of Wharves and Jetties at Mesaieed Port</title>
		<link>https://construction.stfa.com/project/repair-of-wharves-and-jetties-project/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Fri, 30 May 2014 17:42:34 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=437</guid>

					<description><![CDATA[The project, which involves the Mesaieed Industrial City (MIC), includes various pier and dock repairs, reinforcements, insulation and coating works.]]></description>
										<content:encoded><![CDATA[<p>The project, which involves the Mesaieed Industrial City (MIC), includes various pier and dock repairs, reinforcements, insulation and coating works.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Engineering, Procurement, Installation and Commissioning for Container Terminal (berth No. 7) at Mesaieed Port</title>
		<link>https://construction.stfa.com/project/engineering-procurement-installation-and-commissioning-for-container-terminal-berth-no-7-at-mesaieed-port/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Fri, 30 May 2014 13:21:29 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=435</guid>

					<description><![CDATA[The cope line for the new Berths 7A and 7B is a straight continuation of the cope line for the existing ...]]></description>
										<content:encoded><![CDATA[<p>The cope line for the new Berths 7A and 7B is a straight continuation of the cope line<br />
for the existing Berth 6 and the recently built Temporary Berth 7. Berths 7A and 7B will incorporate the Temporary Berth 7. The combined structure of Berths 7A and 7B will have a final total length of about 485m, including the Temporary Berth 7. The length is defined as the overall length including tie-ins to the existing Berth 6 and the planned Berth 8 (planned Qatalum Jetty).</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
