Al Khalij Power Plant Project

This work was conducted on an agreement signed with Arcona oil services Libya in order to carry out near shore geotechnical investigations for Al Khalij power plant project. Atotal of bine near shore boreholes drilled up to maximum 16.25m. Total length of drilling is 144.75m.

Tripoli Tower Project

The investigation consisted; drilling a total of 15 nos. boreholes (a total of 8 boreholes drilled up to 25m. depths at park section, a total of 4 boreholes drilled up to 50m. depths, a total of 2 boreholes drilled up to 60m. depths and 1 borehole drilled up to 70m. depth at tower section), together with the relevant field tests, such as Standard Penetration Tests (SPT), Permeability tests, Seismic Wave Down Hole Testing , Menard Pressuremeter tests are performed at selected boreholes.

Souk Al Ahad 2000 Housing Project

A total of 7 boreholes with designated numbers BHP1 through BHP7 were drilled to depths between 10.0 and 25.0m at investigated site for preliminary investigations.
A total of 74 boreholes with designated numbers BH01 through BH95 were drilled to depths between 7.0 and 10.45 m at investigated site for detailed investigations.