<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Tunnels / Metros &#8211; STFA Construction Group</title>
	<atom:link href="https://construction.stfa.com/portfolio_category/tunnels/feed/" rel="self" type="application/rss+xml" />
	<link>https://construction.stfa.com</link>
	<description>We Know How</description>
	<lastBuildDate>Mon, 13 Mar 2023 07:48:12 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
	<item>
		<title>Qatar Integrated Railway Project  Design &#038; Build Package 3  Gold Line Underground</title>
		<link>https://construction.stfa.com/project/qatar-integrated-railway-project-design-build-package-3-gold-line-underground/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Fri, 26 Sep 2014 11:58:25 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=1378</guid>

					<description><![CDATA[Tunnel Construction, Station Construction, Switchboxes, Emergency Exits, Passengerway (NATM / CutCover), Architectural Finishes (PS), ElectroMechanical Works (PS), Utilities (PS) Click to ...]]></description>
										<content:encoded><![CDATA[<p>Tunnel Construction, Station Construction, Switchboxes, Emergency Exits, Passengerway (NATM / CutCover), Architectural Finishes (PS), ElectroMechanical Works (PS), Utilities (PS)</p>
<p><strong>Click to watch video.</strong></p>
<blockquote class="wp-embedded-content" data-secret="NxbRp6iEWS"><p><a href="https://construction.stfa.com/qatar-integrated-railway-project-design-build-package-3-gold-line-underground/">Qatar Integrated Railway Project  Design &#038; Build Package 3  Gold Line Underground</a></p></blockquote>
<p><iframe class="wp-embedded-content" sandbox="allow-scripts" security="restricted"  title="&#8220;Qatar Integrated Railway Project  Design &#038; Build Package 3  Gold Line Underground&#8221; &#8212; STFA Construction Group" src="https://construction.stfa.com/qatar-integrated-railway-project-design-build-package-3-gold-line-underground/embed/#?secret=b1WvbNsm0D#?secret=NxbRp6iEWS" data-secret="NxbRp6iEWS" width="600" height="338" frameborder="0" marginwidth="0" marginheight="0" scrolling="no"></iframe></p>
<p>&nbsp;</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Underground Installations</title>
		<link>https://construction.stfa.com/project/underground-installations/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 14:27:25 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=554</guid>

					<description><![CDATA[The works involved the construction of underground storage tanks for fuel, water and ammunition together with access and connection tunnels.]]></description>
										<content:encoded><![CDATA[<p>The works involved the construction of underground storage tanks for fuel, water and ammunition together with access and connection tunnels.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Muna Project Tunnels 3a &#8211; 3b</title>
		<link>https://construction.stfa.com/project/muna-project-tunnels-3a-3b/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 14:26:40 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=553</guid>

					<description><![CDATA[The construction of two pedestrian tunnels as part of the transportation system of facilitate the pilgrimage traffic between Kaabe and Holy ...]]></description>
										<content:encoded><![CDATA[<p>The construction of two pedestrian tunnels as part of the transportation system of facilitate the pilgrimage traffic between Kaabe and Holy places during Hadj season in Makkah. The tunnels are in horse shoe section with dia 12.5m and length is 1225 m.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Muna Project Toilet Tunnels 3a, 3b, 3c in Makkah Area</title>
		<link>https://construction.stfa.com/project/muna-project-toilet-tunnels-3a-3b-3c-in-makkah-area/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 14:25:48 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=552</guid>

					<description><![CDATA[The Project covered the construction of the first three Toilet Tunnels of the Muna Project, situated at both sides of the ...]]></description>
										<content:encoded><![CDATA[<p>The Project covered the construction of the first three Toilet Tunnels of the Muna Project, situated at both sides of the Muna Project Tunnels 3A-3B facing Kaabe to provide toilet facilities to 600 pilgrims simultaneously, especially during the Hadj Season.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Muna Project Tunnels 2a-2b</title>
		<link>https://construction.stfa.com/project/muna-project-tunnels-2a-2b/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 14:25:01 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=551</guid>

					<description><![CDATA[The Project covered the construction of two parallel semicircular pedestrian tunnels as part of the transportation system to facilitate the pilgrimage ...]]></description>
										<content:encoded><![CDATA[<p>The Project covered the construction of two parallel semicircular pedestrian tunnels as part of the transportation system to facilitate the pilgrimage traffic between Kaabe and Holy Places during Hadj Season in Mecca.<br />
The tunnels are in horse shoe section.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Makkah Streets Beautification Stages 2, Tunnel 2 and 3, Viaduct 1</title>
		<link>https://construction.stfa.com/project/makkah-streets-beautification-stages-2-tunnel-2-and-3-viaduct-1/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 14:24:00 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=550</guid>

					<description><![CDATA[The project which consisted of two sets of twin tunnels and viaducts successively, aimed to facilitate the flow of traffic around ...]]></description>
										<content:encoded><![CDATA[<p>The project which consisted of two sets of twin tunnels and viaducts successively, aimed to facilitate the flow of traffic around Haram during Hadj season.<br />
Tunnel 2: Dia 7.34 m.<br />
Tunnel 3 : Dia 7.34 m.and 5.70 m.<br />
Length : 2&#215;84 m. And 162 m, 166m.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>First Part Of 2nd Stage Of Beautification and Improvement Of Makkah Streets (abi Quabais Mountain&#8217;s Tunnels and Approach Bridge)</title>
		<link>https://construction.stfa.com/project/first-part-of-2nd-stage-of-beautification-and-improvement-of-makkah-streets-abi-quabais-mountains-tunnels-and-approach-bridge/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 14:21:03 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=549</guid>

					<description><![CDATA[The project aimed to facilitate the flow of traffic around Haram during Hadj season. It consisted of twin semicircular tunnels ( ...]]></description>
										<content:encoded><![CDATA[<p>The project aimed to facilitate the flow of traffic around Haram during Hadj season. It consisted of twin semicircular tunnels ( 2x300m ) through Abi Quabais Mauntain and a twin viaduct carrying 2 Lane East- West traffic.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Muna Project Tunnels 2c &#8211; 2d</title>
		<link>https://construction.stfa.com/project/muna-project-tunnels-2c-2d/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 14:18:57 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=548</guid>

					<description><![CDATA[The project covered the construction of two parallel semi circular horse shoe tunnels 2&#215;1220 m. Long and with diameter of 15,70 ...]]></description>
										<content:encoded><![CDATA[<p>The project covered the construction of two parallel semi circular horse shoe  tunnels 2&#215;1220 m. Long and with diameter of 15,70 m. The tunnels are as part of the transportation system of facilitate the vehicular pilgrimage traffic between Kaabe and Holy.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Makkah Tunnels Leading to Haram King Gate Codai &#8211; Al Birkah</title>
		<link>https://construction.stfa.com/project/makkah-tunnels-leading-to-haram-king-gate-codai-al-birkah/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 14:18:13 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=547</guid>

					<description><![CDATA[The project covered the construction of two vehicular tunnels with dia 17.70m and length 2400m and associated toilet tunnels (dia 12.50m, ...]]></description>
										<content:encoded><![CDATA[<p>The project covered the construction of two vehicular tunnels with dia 17.70m and length 2400m and associated toilet tunnels (dia 12.50m, length 857m.) as part of the Makkah Tunnels Leading to Haram project to facilitate the traffic between Holy Places.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>First Stage Of Istanbul Sewerage Project, Construction Of Fatih, Haliç and Eyüp Tunnels</title>
		<link>https://construction.stfa.com/project/first-stage-of-istanbul-sewerage-project-construction-of-fatih-halic-and-eyup-tunnels/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 14:16:13 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=546</guid>

					<description><![CDATA[The project covered the boring of 3 tunnels on the South West side of Golden Horn at Eyüp, Haliç and Fatih ...]]></description>
										<content:encoded><![CDATA[<p>The project covered the boring of 3 tunnels on the South West side of Golden Horn at Eyüp, Haliç and Fatih 1858 m, 2648 m, and 1877 m long respectively, 2 nos. of deep shaft constructions, construction of 19 manhole chambers, 1122 m R.C. piping.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
