<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Hydraulic Works &#8211; STFA Construction Group</title>
	<atom:link href="https://construction.stfa.com/portfolio_category/hydraulic-works/feed/" rel="self" type="application/rss+xml" />
	<link>https://construction.stfa.com</link>
	<description>We Know How</description>
	<lastBuildDate>Mon, 30 Jun 2014 21:26:16 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
	<item>
		<title>Kadincik Ii Hydroelectric Project</title>
		<link>https://construction.stfa.com/project/kadincik-ii-hydroelectric-project/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 15:03:12 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=573</guid>

					<description><![CDATA[The project was an hydroelectric power scheme consisting of a system of dam, intake, diversion tunnel, and powerhouse put into operation ...]]></description>
										<content:encoded><![CDATA[<p>The project was an hydroelectric power scheme consisting of a system of dam, intake, diversion tunnel, and powerhouse put into operation on Kadıncık River located about 35 km. West of Adana-Turkey.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Benghazi Main Drainage-phase Ii</title>
		<link>https://construction.stfa.com/project/benghazi-main-drainage-phase-ii/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 15:02:33 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=572</guid>

					<description><![CDATA[The Project comprised the works for Phase II of Benghazi Main Drainage System with 4 main collector outfalls made of reinforced ...]]></description>
										<content:encoded><![CDATA[<p>The Project comprised the works for Phase II of Benghazi Main Drainage System with 4 main collector outfalls made of reinforced concrete, twin and single box culverts.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Const. Of122 No&#8217;s Of Trenches and Channels Of Length 90 Km in the Region Of Tobruk</title>
		<link>https://construction.stfa.com/project/const-of122-nos-of-trenches-and-channels-of-length-90-km-in-the-region-of-tobruk/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 15:01:51 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=571</guid>

					<description><![CDATA[The project is the construction, transportation and assembly of precast units for trench places and channels. The quantity of excavation work ...]]></description>
										<content:encoded><![CDATA[<p>The project is the construction, transportation and assembly of precast units for trench places and channels. The quantity of excavation work was 250.000 cubic meters.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Water Distribution Network, Phase Ii, Makkah</title>
		<link>https://construction.stfa.com/project/water-distribution-network-phase-ii-makkah/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 15:00:53 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=570</guid>

					<description><![CDATA[The project covers the providing all material, labour, equipment and installation of a water distribution network, setting up valves, valve chambers, ...]]></description>
										<content:encoded><![CDATA[<p>The project covers the providing all material, labour, equipment and installation of a water distribution network, setting up valves, valve chambers, water hydrants, fire hydrants and water sewerage connection.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Muna Project Bulk Reservoir No.1, Roof Structure</title>
		<link>https://construction.stfa.com/project/muna-project-bulk-reservoir-no-1-roof-structure/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 15:00:04 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=569</guid>

					<description><![CDATA[The project covered the construction of a cable stayed reinforced concrete to shell roof, 330 m in diameter cover for approximately ...]]></description>
										<content:encoded><![CDATA[<p>The project covered the construction of a cable stayed reinforced concrete to shell roof, 330 m in diameter cover for approximately one million water cubic meter circular bulk storage reservoir near Al-Maarsine-Makkah.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Storm Water Drainage Project Of Holy, Makkah</title>
		<link>https://construction.stfa.com/project/storm-water-drainage-project-of-holy-makkah/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 14:57:40 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=568</guid>

					<description><![CDATA[The project covered the drainage lines leading to the new Shoheda Dam, construction of 7000 m. of various types of box ...]]></description>
										<content:encoded><![CDATA[<p>The project covered the drainage lines leading to the new Shoheda Dam, construction of 7000 m. of various types of box culverts and restauration works of Al Hadj Street in accordance with the contract scope and variation orders.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Construction Of Water Transmission Main and Pumping Station in the Holy City Of Makkah, Contract-1</title>
		<link>https://construction.stfa.com/project/construction-of-water-transmission-main-and-pumping-station-in-the-holy-city-of-makkah-contract-1/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 14:56:56 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=567</guid>

					<description><![CDATA[The project involved the construction of a 6000 m3/hr capacity pumping station, a twin water transmission main 9920 m long with ...]]></description>
										<content:encoded><![CDATA[<p>The project involved the construction of a 6000 m3/hr capacity pumping station, a twin water transmission main 9920 m long with 1000 mm diameter and also another 16951 m. long 1000 mm. Diameter single water transmission main.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Rainwater Collection Reservoirs in Sirt Area</title>
		<link>https://construction.stfa.com/project/rainwater-collection-reservoirs-in-sirt-area/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 14:56:08 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=566</guid>

					<description><![CDATA[Design and construction of 6 (six) reservoirs for rainwater collection in Sirt Area.]]></description>
										<content:encoded><![CDATA[<p>Design and construction of 6 (six) reservoirs for rainwater collection in Sirt Area.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>şile Caisson Wells and Darlik Derivation Project, Istanbul</title>
		<link>https://construction.stfa.com/project/sile-caisson-wells-and-darlik-derivation-project-istanbul/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 14:55:30 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=565</guid>

					<description><![CDATA[Collection of both sea and river waters (and also a small amount of underground water) into 4 nos of caisson wells ...]]></description>
										<content:encoded><![CDATA[<p>Collection of both sea and river waters (and also a small amount of underground water) into 4 nos of caisson wells and transfer into a new build pump station and transfer of the water by the pumps to Darlık Dam lake through 1000 mm diameter pipes.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Istranca Rivers Kiyiköy Region Early Water Supply Project</title>
		<link>https://construction.stfa.com/project/istranca-rivers-kiyikoy-region-early-water-supply-project/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sat, 31 May 2014 14:50:51 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=564</guid>

					<description><![CDATA[Construction of small dams (3 nos) on the rivers flowing to the Black Sea from the Istıranca Mountains and formation of ...]]></description>
										<content:encoded><![CDATA[<p>Construction of small dams (3 nos) on the rivers flowing to the Black Sea from the Istıranca Mountains and formation of reservoirs and installation of app. 17.5 km of watermains (dia. 1800 mm steel pipes) to the Terkos lake in Istanbul.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
