<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Geotechnical Investigation &amp; Analysis &#8211; STFA Construction Group</title>
	<atom:link href="https://construction.stfa.com/portfolio_category/geotechnical-investigation-and-analysis/feed/" rel="self" type="application/rss+xml" />
	<link>https://construction.stfa.com</link>
	<description>We Know How</description>
	<lastBuildDate>Sun, 12 May 2019 07:46:07 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
	<item>
		<title>Turkmenbashi International Port Project</title>
		<link>https://construction.stfa.com/project/turkmenbashi-international-port-project/</link>
		
		<dc:creator><![CDATA[Ferdi Tiyek]]></dc:creator>
		<pubDate>Fri, 10 May 2019 13:19:29 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=4161</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[
<div id="wpc_69f51d7a22758" class="vc_row wpb_row vc_row-fluid  ">
		<div class="row_inner_wrapper  clearfix">
			<div class="row_inner row_center_content clearfix"><div class="wpb_column vc_column_container vc_col-sm-12"><div class="vc_column-inner"><div class="wpb_wrapper">
	<div class="wpb_text_column wpb_content_element " >
		<div class="wpb_wrapper">
			<p>The scope of work includes onshore /nearshore drillings, in situ testings onshore and nearshore geophysical measurements, laboratory testing and factual reporting</p>

		</div>
	</div>
</div></div></div>
			</div>
		</div>
</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>New Main Brine  Intake Pumping Station Phase-1 and Phase-2 At Dead Sea Project</title>
		<link>https://construction.stfa.com/project/new-main-brine-intake-pumping-station-phase-1-and-phase-2-at-dead-sea-project/</link>
		
		<dc:creator><![CDATA[Ferdi Tiyek]]></dc:creator>
		<pubDate>Fri, 01 Feb 2019 12:52:26 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=4152</guid>

					<description><![CDATA[The scope of work includes onshore /nearshore drillings, in situ testings including Sea Bed CPTu and Seismic SCPT testing, onshore and ...]]></description>
										<content:encoded><![CDATA[<p>The scope of work includes onshore /nearshore drillings, in situ testings including Sea Bed CPTu and Seismic SCPT testing, onshore and nearshore geophysical measurements, laboratory testing and factual reporting</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>High Speed Highway Between Ashgabat and Turkmenbashy Site Investigation</title>
		<link>https://construction.stfa.com/project/high-speed-highway-between-ashgabat-and-turkmenbashy-site-investigation/</link>
		
		<dc:creator><![CDATA[Ferdi Tiyek]]></dc:creator>
		<pubDate>Wed, 01 Aug 2018 13:07:57 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=4157</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[
<div id="wpc_69f51d7a24aad" class="vc_row wpb_row vc_row-fluid  ">
		<div class="row_inner_wrapper  clearfix">
			<div class="row_inner row_center_content clearfix"><div class="wpb_column vc_column_container vc_col-sm-12"><div class="vc_column-inner"><div class="wpb_wrapper">
	<div class="wpb_text_column wpb_content_element " >
		<div class="wpb_wrapper">
			<p>The scope of work includes onshore drillings , in situ testings , onshore geophysical measurements, laboratory testing and geotechnical reporting</p>

		</div>
	</div>
</div></div></div>
			</div>
		</div>
</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Koromkhetı Hydropower Project</title>
		<link>https://construction.stfa.com/project/koromkheti-hydropower-project/</link>
		
		<dc:creator><![CDATA[Ferdi Tiyek]]></dc:creator>
		<pubDate>Tue, 10 May 2016 14:15:16 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=4171</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[
<div id="wpc_69f51d7a255ac" class="vc_row wpb_row vc_row-fluid  ">
		<div class="row_inner_wrapper  clearfix">
			<div class="row_inner row_center_content clearfix"><div class="wpb_column vc_column_container vc_col-sm-12"><div class="vc_column-inner"><div class="wpb_wrapper">
	<div class="wpb_text_column wpb_content_element " >
		<div class="wpb_wrapper">
			<p>Field work comprised of 32 nos boreholes, Performing hand vane test in test pit or trench 44 Nos Performing rising head permeability test 8 Nos Performing constant head permeability test 30 Nos Performing single packer water pressure test 35 Nos and performs laboratory tests and preparation of geotechnical report.</p>

		</div>
	</div>
</div></div></div>
			</div>
		</div>
</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Tace Mainsite Verification And Marine Soil Investigation</title>
		<link>https://construction.stfa.com/project/tace-mainsite-verification-and-marine-soil-investigation/</link>
		
		<dc:creator><![CDATA[Ferdi Tiyek]]></dc:creator>
		<pubDate>Wed, 10 Jun 2015 14:21:19 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=4176</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[
<div id="wpc_69f51d7a25f9c" class="vc_row wpb_row vc_row-fluid  ">
		<div class="row_inner_wrapper  clearfix">
			<div class="row_inner row_center_content clearfix"><div class="wpb_column vc_column_container vc_col-sm-12"><div class="vc_column-inner"><div class="wpb_wrapper">
	<div class="wpb_text_column wpb_content_element " >
		<div class="wpb_wrapper">
			<p>ONSHORE AND NEARSHORE GEOTECHNICAL INVESTIGATION</p>
<p>• Drilling of 73 nos onshore and 4 nos nearshore boreholes. Conducting standard penetration tests and collecting shelby samples. Also 4 standpipe piezometers are installed in some of the boreholes to measure the groundwater level.<br />
• Conducting 20 nos Field CBR and 7 nos Plate<br />
Load Tests<br />
• Performing geophysical tests including total 7 nos<br />
seismic downhole</p>

		</div>
	</div>
</div></div></div>
			</div>
		</div>
</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Aegean Refinery Project</title>
		<link>https://construction.stfa.com/project/aegean-refinery-project/</link>
		
		<dc:creator><![CDATA[Ferdi Tiyek]]></dc:creator>
		<pubDate>Sun, 14 Dec 2014 14:15:53 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=1812</guid>

					<description><![CDATA[TERRACE 1 &#8211; On the onshore part of the investigation site “Terrace 1”, 46 boreholes are drilled to max. 41.00 meters ...]]></description>
										<content:encoded><![CDATA[<p>TERRACE 1 &#8211; On the onshore part of the investigation site “Terrace 1”, 46 boreholes are drilled to max. 41.00 meters of depth. Furthermore, 5 nos pressuremeter tests, 8 nos permeability tests, 1 no seismic refraction, 1 no seismic reflection, 4 nos electric resistivity tests,laboratory tests are carried out and 2 nos casagrande type standpipe are installed for ground water monitoring.<br />
TERRACE 2 &#8211; On the onshore part of the investigation site “Terrace 2”, 102 boreholes are drilled to max. 40.50 meters of depth. Furthermore, 11 nos pressuremeter tests, 8 nos permeability tests, 1 nos water pressure tests, 8 nos seismic refraction, 4 nos seismic reflection, 11 nos seismic down-hole tests and 7 nos seismic cross-hole tests, 22 nos electric resistivity tests, laboratory tests are carried out and 4 nos Casagrande type standpipe piezometers are installed ground water monitoring.<br />
TERRACE 3 &#8211; On the onshore part of the investigation site “Terrace 3”, 60 boreholes are drilled to max. 41.00 meters of depth. Furthermore, 7 nos pressuremeter tests, 8 nos permeability tests, 3 nos seismic refraction, 3 nos seismic reflection, 4 nos seismic down-hole tests and 1 nos seismic cross-hole tests, 8 nos electric resistivity tests, 1 no thermal resistivity test , laboratory tests are carried out and 3 nos Casagrande type standpipe piezometers are installed ground water monitoring.<br />
TERRACE 4 &#8211; On the onshore part of the investigation site “Terrace 4”, 113 boreholes are drilled to max. 40.00 meters of depth. Furthermore, 8 nos pressuremeter tests, 12 nos permeability tests, 6 nos seismic refraction, 3 nos seismic reflection, 7 nos seismic down-hole tests and 3 nos seismic cross-hole tests, 22 nos electric resistivity tests, 1 no thermal resistivity tests, laboratory tests are carried out and 6 nos casagrande type stand-pipe piezometers are installed for ground<br />
water monitoring.<br />
TERRACE 5 &#8211; On the onshore part of the investigation site “Terrace 5”, 70 boreholes are drilled to max. 60.00 meters of depth. Furthermore, 5 nos pressuremeter tests, 6 nos permeability tests, 10 nos seismic refraction, 4 nos seismic reflection, 1 no seismic down-hole tests and 1 no seismic cross-hole tests, 16 nos electric resistivity tests, laboratory tests are carried out and 3 nos casagrande type standpipe piezometers are installed for ground water monitoring.<br />
TERRACE 6 &#8211; On the onshore part of the investigation site “Terrace 6”, 38 boreholes are drilled to max. 50.00 meters of depth. Furthermore, 4 nos pressuremeter tests, 7 nos permeability tests, 7 nos seismic refraction, 4 nos seismic reflection, 2 nos seismic down-hole tests, 5 nos electric resistivity tests and laboratory tests are carried out and 1 no casagrande type standpipe are installed for ground water monitoring<br />
OFFSHORE &#8211; On the Off shore part of the investigation, 35 boreholes are drilled to<br />
max. 83.50 meters of depth and laboratory tests are executed on<br />
suitable samples.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>PS Yard Yarımca Container Terminal Project</title>
		<link>https://construction.stfa.com/project/ps-yard-yarimca-container-terminal-project/</link>
		
		<dc:creator><![CDATA[Ferdi Tiyek]]></dc:creator>
		<pubDate>Sat, 13 Dec 2014 13:17:13 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=1721</guid>

					<description><![CDATA[Accordingly the scope of the soil investigation, the fieldwork covers drilling a total of 27 nos. on shore boreholes for PS ...]]></description>
										<content:encoded><![CDATA[<p>Accordingly the scope of the soil investigation, the fieldwork covers drilling a total of 27 nos. on shore boreholes for PS Yard Yarımca Container Project, with core or soil recovery, sampling, carriying out of in-situ test in borehole like Standart Penetration Test (SPT), and performs laboratory tests and preparation of geotechnical report.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Great Man Made River Project Geotechnical Investigations Phase 2</title>
		<link>https://construction.stfa.com/project/great-man-made-river-project-geotechnical-investigations-phase-2/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sun, 01 Jun 2014 12:00:32 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=714</guid>

					<description><![CDATA[The project covers a total of 617 boreholes and 193 testpits at the Central &#38; Eastern Branch and Abu Aisha Storage ...]]></description>
										<content:encoded><![CDATA[<p>The project covers a total of 617 boreholes and 193 testpits at the Central &amp; Eastern Branch and Abu Aisha Storage Reeservoirs in Libya.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>The Study on a Disaster Prevention/mitigation Basic Plan in Istanbul Including Seimic Microzonation Geotechnical &#038; Geophysical Factual Report</title>
		<link>https://construction.stfa.com/project/the-study-on-a-disaster-preventionmitigation-basic-plan-in-istanbul-including-seimic-microzonation-geotechnical-geophysical-factual-report/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sun, 01 Jun 2014 11:59:45 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=713</guid>

					<description><![CDATA[Geotechnical &#038; geophysical investigations have been carried out in both the European and Anatolian sides of İstanbul. The field work of ...]]></description>
										<content:encoded><![CDATA[<p>Geotechnical &#038; geophysical investigations have been carried out in both the European and Anatolian sides of İstanbul. The field work of the investigation includes drilling of 48 boreholes, execution of 40 microtremor and  39 PS Logging measurements.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Port Of Bourgas Expansion Project Offshore Geotechnical Investigations</title>
		<link>https://construction.stfa.com/project/port-of-bourgas-expansion-project-offshore-geotechnical-investigations/</link>
		
		<dc:creator><![CDATA[stfaconst]]></dc:creator>
		<pubDate>Sun, 01 Jun 2014 11:58:34 +0000</pubDate>
				<guid isPermaLink="false">http://construction.stfa.com/?post_type=portfolio&#038;p=712</guid>

					<description><![CDATA[This work has been carried out in order to determine the soil conditions of Bourgas Port, Basin Area, Wharf Foundation, Reclamation ...]]></description>
										<content:encoded><![CDATA[<p>This work has been carried out in order to determine the soil conditions of Bourgas Port, Basin Area, Wharf Foundation, Reclamation Area and Breakwater Foundation. A total of 48 boreholes were drilled. 15 boreholes on the Basin Area.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
